Home    Grand Canyon River Running   5/16/2007  
Previous Home Next



Construction of the original Navajo Bridge began in 1927, and the bridge opened to traffic in 1929. The new steel arch bridge was completed in September of 1995, at a cost of approximately $15 million dollars. The old bridge is now a walkway. Total length: 909 ft; Steel arch length: 726 ft; Height above river: 470 ft;

Mile 4 - Navajo Bridge -
M004_P5160111